The northern railways on Friday opened India's longest railway tunnel piercing through the Pir Panjal range in Jammu & Kashmir.
The tunnel is part of the ambitious Udhampur - Srinagar - Baramulla rail link project of Northern Railways. At 10.96km long, the Pir Panjal Railway Tunnel is India's longest and Asia's 2nd longest tunnel, aimed at reducing the travel distance between Quazigund and Banihal to only 11 km and providing a hassle-free travel up to Baramulla.
The 10.96 kms tunnel, which is aligned straight from north to south, is 100 percent water-proof and is also equipped with fire fighting system throughout its entire length.
The construction of the tunnel started in November 2005 and was complete in 2011. The total cost of the tunnel was Rs.391 crores.
The train would take 6.6 minutes to travel this distance from Banihal in south side to Qazigund in north side of the mountain and thus would take passenger from Jammu region in to Kashmir region just six minutes.